33,000 SF LABORATORY FACILITY RENOVATION
- Phased Construction to Keep Facility Operational
- Finish Upgrades Including Flooring, Paint, Ceilings and Cabinetry
- HVAC Upgrades to Provide Temperature and Humidity Control to the Labs and Office Areas
- Replaced the Existing Storefront Vestibule to Enhance the Building’s Curb Appeal
- Electrical Provisions for Specialty Freezers, Fridges and Lab Equipment
- Design/Build Delivery