±800,000 SF Cross-dock Factory Distribution Center
- 7”-thick non-reinforced concrete floorslab with Ashford Densifier and caulked joints
- 70 Dock Positions with Shelters, Fully Integrated Automatic Restraints, and 45,000# Hydraulic Levelers
- 32’ clear in storage bays and 29’ clear in speed bays
- 80’-deep speed bays
- Convectional-steel framing with structural concrete tilt-up walls
- FM 1-60 Compliant TPO Roofing
- FM ESFR Fire Protection with exterior underground loop fed from onsite diesel fire pump
- Heated & Ventilated warehouse with HVLS Fans for summer circulation
- 4000-amp Electrical Service with Roll-up Generator CAMLock Box
- 1600-amp battery charging subpanel with independent metering
- Emergency generator with separate distribution system
- LED Lighting with Motion Sensors
- 150 Trailer Storage Stalls
- Separate Guardhouse with ADA restroom
- Hardened restroom bank to serve as severe weather shelter
- Utilities provided to all four (4) corners for separate demising to up to four (4) tenants
- US Army Corps 404 Permit & Stream Mitigation Offsite
- Relocated 138kV Transmission Lines to open property for building
- 700’ Long, 20’ Tall soil nail retaining wall holding up water treatment plant and utility substation on property line
- 600 LF Overhead Conveyor Bridge Connecting the DC to the existing manufacturing plant to carry finished goods directly into the new facility
- Pursuing LEED V4 Certification
- Silver LEED Certification